
L112 BACKREST
Backrest
About the Backrest
The Model L112 Ergonomic Backrest from SingOFai Furniture is a high-performance component engineered for manufacturers of premium office seating. Defined by its robust bionic structural frame and an integrated independent lumbar support system, this backrest is designed to provide maximum spinal pressure relief and dynamic flexibility.
Constructed using precision injection molding with reinforced materials, the L112 offers a substantial 736mm height and 510mm top width, making it a versatile foundation for high-back executive or task chairs. Its sophisticated architectural design not only ensures long-term industrial durability but also provides a striking aesthetic for global brands looking to integrate advanced ergonomic technology into their own chair assemblies.




